ML19209A034
| ML19209A034 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/21/1978 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19209A035 | List: |
| References | |
| AECM-78-51, NUDOCS 7910010810 | |
| Download: ML19209A034 (1) | |
Text
.
.m I. 7. pf I.5MISSISSIPPI POWER & LIGHT COMPANY 7
a 5
IN Helping B uild Afis sis sippi 4
$ P. O. B U X 16 4 0, J AC K S O N. MISSISSIPPI 3 912 0 5 July 21, 1978 p aoo uci.o ~ o c c.a r-t u,
~
n
(
Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Conmission Region II i
101 !!a riet t a St reet, Suit e 3100 AL L. a t a. G A 30303 Attention:
Mr. J. P. O' Reilly, Director
Dear Mr. O'Reilly:
SUBJ ECT :
Grand Gulf !.ucicar Station File 0272/0498/15525/15526 Interim P.eport for Potentially Reportable Deficier.cy No. 78/02 as Defined in 10 CFR 50.55(e)
AEC11-78 / 51 On June 23, 1978, Mississippi Power & Light contacted Mr. V. L. Brownlee the Grand of your office regarding a Potentially Reportable Deficiency at Gulf Nuclear Station construction site.
The Deficiency concerns the factory weld separation on strut type hanger material. We will determine reportability of this deficiency as def ined by 10 CFR 50.55(e) and make a final report by November 15, 1978. The attached Interim Report describes the details of this matter.
Yours truly,
. ( c. _
'}/.
f
,J.
P. McGaughy, Jr.
Director of Power Production JRF/WDH/LFD :de Attachment cc:
Mr.
R.
B. McGehee Mr. T.
B.
Conner Mr. N. L. Stampley Dr. Ernst Volgenau, Director <G THIS COPY FOR Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission 1033 s
Washington, D. C. 20555 i
782230014 9
f
?9100 3o gjg Meniner Middie South Utilities System