ML19209A013

From kanterella
Jump to navigation Jump to search
Responds to NRC 780712 Ltr Re Violations Noted in IE Insp Repts 50-416/78-09 & 50-417/78-09.Corrective Actions:Const Personnel Have Been Assigned to Monitor Storage in Areas of Responsibility
ML19209A013
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 08/04/1978
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19209A012 List:
References
AECM-78-56, NUDOCS 7910010779
Download: ML19209A013 (2)


Text

.

=7 i

f _q ~

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi

' M N P. O. D O X 1 G 4 0, JACKSON, MIS SISSIPPI 39205 n o o u c v i o ,. o t m v o c , August 4, 1978 U. S. Nuclear Regulatory Conmission Region 11 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director Centlemen:

I

SUBJECT:

Grand Gulf Nuclear Station File 0272/0494/15521 Units 1 and 2 RII: PKV 50-416, 417/78-09 IE Inspection Report of 6/13 through 6/16, 1978

  • PE C 78/51*

AECM- 78/ 56 In response to your letter of July 12, 1978, transmitting the IE Inspectica Report of the June 13 through June 16, 1978 inspection and which required initiation of corrective actions, the following is submitted:

(1) Corrective Steps Taken and Results Achieved.

Nonconforcance documents were issued to correct the specific findtngs of the inspection report. These documents have been reviewed and closed out. Appropriate construction personnel were rein =tructed in the storage requirements. A concerted effort was made to survey piping storage conditions and correct dis-crepancies.

(2) rorrective Steps Taken to Avoid Further Noncompliance.

Appropriate construction personnel have been assigned to daily monitor storage in their areas of responsibility. Quality Control surveillance of storage conditions are conducted daily and unsatisfactory storage conditions are corrected icnediately or reported as nonconformances if incediate corrections can not be made.

(

10 Member Middle Snuth 11tilities Svstem 7910010 g 7

MISSISSIPPI POWER & LIGHT COMPANY

(

Mr. J. P. O'Reilly, Director AECM-78/56 Page 2 (3) Date To Achieve Full Compliance.

A Quality Assurance surveillance was conducted on July 27, 1978. Storage was in compliance with WP/P-14.

We find no proprietary data contained in the inspection report.

l Yours truly .

fs ,.

.S v'}

J. P. McCaughy, Jr.

, Director of Power Production ATR:lb cc: Dr. T. W. Schnatz Mr. J . N . Ward Mr. A. Zaccaria M r . D . M . Lake Mr. R. L. Scott Mr. P. R. Britnell Mr. N. L. Stampley Mr. T. E. Reaves, Jr.

Mr. C. K. McCoy Mr. L. F. Dale Mr. P. W. Sly NRC Inspection Report File File l033 .