ML19208D805
| ML19208D805 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/10/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 7910010001 | |
| Download: ML19208D805 (1) | |
Text
CENTRAL FILES
- " %'o PDR:HQ UNITED STATES R
~,,
[h g
NUCLEAR REGULATORY COMMISSION 3$y,
- c. j REGION IV NSIC 0, YA C
611 RYAN PL AZA DRIVE, SUITE 1000
%,3 O
,o#
AR LINGToN, T E X AS 76012 September 10, 1979 Docket Nos.
50-313 50-368 Arkansas Power and Light Company ATTN:
Mr. William Cavanaugh III Vice President of Generation and Construction P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
The enclosed IE Circular No. 79-18 is forwarded to you for information.
No written response is required. Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely, M.
'~ '
/ Karl V.' Seyfrit I;
Director
Enclosures:
1.
IE Circular No. 79-18 2.
List of IE Circulars Issued in Last Six Months cc: James P. O'Hanlon, Plant Manager Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 1057 281 791001000/
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Circular No. 79-18 Date:
September 10, 1979 Page 1 of 2 PROPER INSTALLATION OF TARGET ROCK SAFETY-RELIEF VALVES Description of Circumstances:
As a result of NRC monitoring of operating experiences involving the Target Rock safety-relief valve, two potential problems have been identified. One potential problem is that the performance of the valve has been found to be impaired by either excessive or insufficient insulation around the valve body when installed in its service environment. The other potential problem is that improper assembly of the modified valve can result in inoperability.of the remote air actuator.
The Target Rock safety-relief valve is a dual purpose valve in that overpressure response is provided by pilot valve action and automatic depressurization (ADS) is provided by a remote air actuator. Valve operation has been found to be affected by the amount of insulation placed around the valve body. A previous IE Bulletin No. 76-06 was issued on July 21, 1976, as a result of operating experiences where excessive insulation was installed on the valve.
The excessive insulation caused excessive heat to be retained producing a higher temperature environment for the elastomeric diaphragm which resulted in accelerated deterioration of the elastomer. Failure of the elastomeric diaphragm makes the valve inoperable in the power-operation mode (i.e., manual and ADS).
Subsequently, a silicone-nomex diaphragm was developed by the manufacturer to provide a longer life in high temperature environments.
In addition, the IE Bulletin explicitly required that insulation be installed in accordance with the manufacturer's recommendations.
A recent licensee event report from the Monticello facility identified a potential problem resulting from insufficient insulation (i.e., just opposite of the condition addressed by IE Bulletin 76-06). During the performance of special testing of the response to safety-relief valve operation, a valve was discovered to be exceeding its design delay time for opening.
Subsequent inspection and testing of the valve revealed that insufficient insulation may cause condensation to accumulate in the pressure venting ports which then results in delaying the opening of the main disk. This slower response time is significant with respect to primary system overpressure and similar transient response analyses. Although the reported event at Monticello involved the three-stage Target Rock safety-relief s of insulation are similarly applicable DUPLICATE DOCUMENT valves.
Entire document previously entered into system under:
xNo 9101t2oo395 1057 282 No. of pages:
88
_.