See also: IR 05000301/1979012
Text
/
/b
[gaareg%,
,
'
UNITED STATES
i'
, cf,' 7,
NUCLEAR REGULATORY COMMISSION
5[
, ",Y
- $
REGION 111
'
799 ROOSEVELT ROAD
o ...../
g
coeu ettvu. ittinois snia7
AUG1 8 bB
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the inspection conducted by Messrs. J. J. Harrison and
K. D. Ward of this office on July 2-20, 1979, of activities at the
int
Beach Nur;r_ar Plant, Unit 2, authorized by NRC Operating License No
DPR-27 and to the discussion of our rindings with Messrs. 9 Reed,
.
J. Greenwood, and R. Harris of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
.4
selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The applicati2n must include a
ful'. statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
1054 017
.909294 h3 2
/
.
Wisconsin Electric Power
-2-
Company
g)g7g
We will 2 adly discuss any c estions you have concerning this
1
inspection.
Sincerely,
dw
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-301/79-12
cc w/ encl:
Mr. G. A. Reed, Manager
Central Files
Reproduction Unit NRC 20b
Local PDR
Sandra A. Bast, Lakeshore
Citizens for Safe Energy