ML19208D596
| ML19208D596 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 06/29/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML19208D594 | List: |
| References | |
| NUDOCS 7909280684 | |
| Download: ML19208D596 (2) | |
See also: IR 05000213/1979010
Text
UNITED STATES
p
o
NUCLEAR REGULATORY COMMISslON
[
REGION I
o
3,
j
631 PARK AVENUE
KING OF PRUS$1 A. PENNSYLVANf A 19406
%,
/
'*****
JUN 2 91979
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN:
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/79-10
This refers to the inspection conducted by Mr. R. Conte of this office on March
27-30, 1979 at Haddam Neck Plant, Haddam, Connecticut of activities authorized
by NRC License No. DPR-61 and to the discussions of our findings held by Mr.
Conte with Mr. R. Graves and other members of your staff at the conclusion of
the inspection, and to subsequent telephone discussions between Mr. Conte and
Mr. Graves on April 3,1979, and between Mr. Conte and Mr. J. Delawrence of your
staff on April 25, 1979.
Areas examined during this ins?ection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the itcm of
noncompliance brought to your attention in a letter dated December 16, 1977. We
have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These items of noncom-
pliance have been categorized into the levels as described in our correspondence
to you dated December 31, 1974.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's "Reles of Practice," Part 2, Title 10,
Code of Federal Pxgulations.
Section 2.201 requires you to submit to this
office, within twenty (20) days of your receipt of this notice, a written state-
ment or explanathn in reply including:
(1) corrective steps which have been
taken by you and tm results achieved; (2) corrective steps which will be taken
to avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
1034
J
7000280 6 fp
Connecticut' Yankee Atomic
2
Power C0mpany
JUN % 91979
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the information, which identifies the
document or part s'ught to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790.
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specifieo period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
_a
s
1
n
. Brunner, Chief
Re tor Operations and Nuclear
S port Branch
Enclosures:
1.
Apperdix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-213/79-10
cc w/ encl:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
1034
J)