ML19208D430

From kanterella
Jump to navigation Jump to search
Forwards LER 79-096/03L-0
Date released: 08/10/2019 Download: ML19208D430


LER 79-096/03L-0:on 790912,HPCI Flow Control Loop Inoperative.Caused by Bad Ramp Generator in Turbine Control Loop.Generator Replaced & Loop Functionally Tested to Ensure Operability
ML19208D431
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/19/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208D431 (1)
Forwards LER 79-096/03L-0
ML19208D429
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/19/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19208D429 (1)