ML19208D366
| ML19208D366 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/08/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19208D367 | List: |
| References | |
| NUDOCS 7909280315 | |
| Download: ML19208D366 (2) | |
See also: IR 05000327/1979037
Text
[b
!o ancg*'o,,
-
UNITED STATES
rSJd O N,
,
,
l'
NUCLEAR REGULATORY COMMISSION
'
REGION 11
-[9[
o
,.c.
'
$
r
101 MARIETT A ST.. N.W.. sulTE 3100
o
4
s
o'
4T LANT A, GEORGI A 30303
f
%
- ...
In Reply Refer To:
RII:RMC
50-327/79-37
50-328/79-22
AUG 0 81979
Tennessee Valley Authority
Attn:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by R. M. Compton of this office
on July 18-20, .979 of activities authorized by NRC Construction Permit
Nos. CPPR-72 and CPPR-73 for the Sequoyah iacility, Units 1 and 2, and
to the discussion of our findings held with J. E. Wilkins at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Pa-t 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a reparate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
1052
101
f
3I
7009280
'4 j
_
. _ .
.
.
_
._.
.
AUG 0g137;
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
.
.
C. E. Murp y, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-327/79-37
and 50-328/79-22
cc w/ enclosures:
G. G. Stack, Project Manager
Post Office Box 2000
Daisy, Tennessee 37319
J. M. Ballentine
Plant Superintendent
Post Office Box 2000
Daisy, Tennessee 37319
J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
1052
102