Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C729
Person / Time
Site: Rancho Seco
Issue date: 09/12/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 7909270288
Download: ML19208C729 (1)


Text

pe asc,

fi, e

.,'4 UNITED STATES I

e E,* y.qf[ 'g NUCLEAR REGULATORY COMMISSION

' T'V/ : c REGION V 5,* '-'

,,f 1999 N. CALIFORNI A BOULEVARD Q,

\\ ' Y v"

,[

SUITr 202, WALNUT CREEK PLAZA WALNUT CREE K. CALIFORNI A 94596 September 12, 1979 Docket flo. 50-312 Sacramento Municipal Utility District P. O. Box 15830 Sacramento, California 95813 Attention:

Mr. John J. Mattimoe Assistant General Manager Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, ff$$,4GC-R. H. Engelken Director

Enclosures:

1.

IE Bulletin tio. 79-23 2.

List of IE Bulletins Issued ir, the Last Six Months cc w/ enclosures:

R. J. Rodriguez, SMUD L. G. Schwieger, SMUD 1049 208 009270gsg

Accession fio. 7903220104 SSlilS Nc.:

6820 UtilTED STATES liUCLEAR P,EGULATORY C0:011SSION OFFICE OF IllSPECTION AtiD EliFORCEMEllT WASHIfiGT0il, D.C.

20555 September 12, 1979 IE Bulletin ?!o. 79-23 P07EilTIAL FAILURE OF EMERGEiiCY DIESEL GEiiERATOR FIELD EXCITER TRANSFORMER Description of Circumstances _:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, t%s interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B IDGs which resulted in overheating of the Exciter Power Transformers (EPTs) it sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Moto. s (Electro-Motive Division) flodel EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

"A potential problem can exist if the naq.ral.of the conorator and the r'anteq nf the primary windings of the excitatio to as the control power transformer (-

DUPLICATE DOCUMENT between the neutrals, or a connection are equally undesirable conditions.

Entire document previously ditions exist, high circulating curre entered into system under:

cercents may exceed transformer ratin failure.