Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C719
Person / Time
Site: Humboldt Bay
Issue date: 09/12/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 7909270275
Download: ML19208C719 (1)


Text

a a'co fju ja ci q%

llNITED STATES f

E

  • /,1 NUCLEAR REGULATORY COMMISSION

$ *p).7,(g/

E k'"b -

REGION V S

7 db f

1990 N. CALIFORNI A BOULEVARD g

'% J o-SUITE 202, WALNUT CitEEK PLAZA

    • ,e*

WALNUT CTIEE K. CALIFORNIA 94596 September 12, 1979 Docket No. 50-133 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you haJe questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely,

/l7

'/

L.l,-7 [ }y'j Q).' /.

P/. 41 Engelken_ ;. /

Sirector

~

I

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months cc w/ enclosures:

W. Barr, PG&E W. Raymond, PG&E E. Weeks, PGLE, Humboldt Bay 1049 183 1 tCRY) o gccames2L O

Accession tio. 7908220104 SSINS No.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF IllSPECTION AND ENF0,.,EMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tt Ipped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manuf acturer's findings and recommer.dations regarding the above problem are described below:

"A potential problem can exist if the j

the primary windings of the excitatio DUPLICATE DOCUMENT to as the control power transformer (

between the neutrals, or a connection Entire document previously are equally undesirable conditions.

entered into system under:

ditions exist, high circulating curre currents may exceed transformer ratin ANo WOS220/Of failure.

No. of pages:

E

~

' 84

-!