ML19208C705
| ML19208C705 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/12/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 7909270254 | |
| Download: ML19208C705 (1) | |
Text
TZe
/-
o UNITED STATES l' ' 3 p g
NUCLEAR REGULATORY COMMISSION
- r REGION 111 e"[
799 ROOSEVELT ROAD 0,
GLEN ELLYN. ILLINOIS 60137 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.
Should you have que stions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, p m _ 0, g -
(/ James G. Kep"pfer Director
Enclosure:
IE Bulletin No. 79-23 cc w/ encl:
Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammell, ORB /NRR PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy 1049 169 7909290 nmwam25p.
O
Accession No. 7908220104 SSINS No.:
6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 12, 1979 IE Bulletin No. 70-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:
Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.
Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.
Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.
The following nameplate data applies to the equipment installed at Turkey Point:
Emergency Diesel Generator General Motors (Electro-Motive Division)
Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:
- ~ ' " ~ - - - - -
"A potential problem can exist if the neutr thw primary windings of the excitation powe DUPLICATE DOCUMENT to as the control power transformer (CPT))
l J
Entire document previously L,
entered into system under:
ANO 9QDg220(Olf 1049 170