Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C703
Person / Time
Site: Callaway  
Issue date: 09/12/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
References
NUDOCS 7909270251
Download: ML19208C703 (1)


Text

s

  • 'o,'

UNITEDf TATES NUCLEAR REGULATORY COMMISSION

...,., (

n

{

.E REGION 111 o,

799 ROOSEVELT ROAD SEP 121979

'g.....,g*

GLEN ELLYN. lLLINOIS 60137 Docket Nc. 50-4533 Docket No. 50-486 Union Electric Company ATTN:

Mr. John K. Bryan Vice President - Nuclear

'P. O. Box 149 St. Louis, MO 63166 Gentlemen:

Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.

Should you have gustions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, g g.g On -

(/ James G. Keppler Director

Enclosure:

IE Bulletin No. 79-23 cc w/ enc 1:

Mr. W. H. Weber, Manager, Nuclear Construction Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Region I & IV Ms. K. Drey Hon. C. J. Frass, Chairman Missouri Public Service Commission 1049 167 Vio1196 c

25l

Accession No. 7908220104 SSINS No.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem ncountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.

Aoproximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model ?T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

"A potential problem can exist if the net ttfe primary windings of the excitation pc DUPLICATE DOCUMENT to as the control power transformer (CPT Entire document previously I

entered into system under:

ANO Md$ ZZ d/Oh'

}h No. of pages:

h

.