Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C697
Person / Time
Site: Marble Hill
Issue date: 09/12/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 7909270245
Download: ML19208C697 (1)


Text

l

'o UNITED STATES 8"

NUCLEAR REGULATORY COMMISSION

~

g

- p REGION 111

/,

o, g

799 ROOSEVELT ROAD b

o GLEN ELLYN. lLLINOIS 60137 N

Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:

Mr. S. W. Shields Vice President - Electric System 1000 East Main Street Plainfield, IN 46168 Gentlemen:

Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, b y - n 0g.__

(/ James G. Keppler Director

Enclosure:

IE Bulletin No. 79-23 cc w/ enc 1:

Mr. R. M. Brown, Construction Project Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae 1049 155

'~7909 270 azamas2%

O

Accession No. 7908220104 SSINS No.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator i

General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

"A. potential problem can exist if the neut thD primary windings of the excitation pow DUPLICATE DOCUMENT to as the control power transformer (CPT))

Entire document previously entered into system under:

ANO T40$22 0/M 1049 156 No. or pages:

--