ML19208C693
| ML19208C693 | |
| Person / Time | |
|---|---|
| Site: | 05000580, 05000581 |
| Issue date: | 09/12/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mcwhorter R OHIO EDISON CO. |
| References | |
| NUDOCS 7909270241 | |
| Download: ML19208C693 (1) | |
Text
l
- pn atcoq'o, UNITED STATES 8*
~ 7, NUCLEAR REGULATORY COMMISSION d
E REGION 111 b[
799 ROOSEVELT ROAD o,
o GLEN ELLYN. ILLINOIS 60137 SEP11 On Pre-CPP The Ohio Edison Company ATTN:
Mr. R. J. McWhorter Vice President Engineering 76 South Main Street Akron, OH 44308 Gentlemen:
Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facility with an operating license or a construction permit.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely,
&genhw VJames G. KejEpfer Director
Enclosure:
IE Bulletin No. 79-23 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission 1049 153 990917o
% 2Mi*
Accession No. 7908220104 SSINS No.:
682D UNITED STATES HbuLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 12, 1379 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:
Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.
Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.
Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.
The following nameplate data applies to the equipment installed at Turkey Point:
Emergency Diesel Generator General Motors (Electro-Motive Division)
Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:
"A potential problem can exist if the na p
tife primary windings of the excitation i DUPLICATE DOCUMENT to as the control power transformer (CP' Entire document previously entered into system under:
ANO Md6226/6y 1049 154 No. or geges: