ML19208C686
| ML19208C686 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/12/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| References | |
| NUDOCS 7909270231 | |
| Download: ML19208C686 (1) | |
Text
+,f ""'G%,'o, b
UNITED STATES D
~^
NUCLEAR REGULATGRY COMMISSION E
REGION 111 b[
0, 799 ROOSEVELT ROAD o
GLEN ELLYN. ILLINOIS 60137 Docket No. 50-461 Docket No. 50-462 Illinois Power Company ATTN:
Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:
Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, G
A=
[Ia. +_% $^N1er mes G. Ke Director
Enclosure:
IE Bulletin No. 79-23 cc w/ enc 1:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General 1049 138 t
7909270 C,,l
Accessi m No. 7908220104 SSINS Ho.:
6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:
Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.
Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.
Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.
The following nameplate data applies to the equipment installed at Turkey Point:
Emergency Diesel Generator General Motors (Electro-Motive Division)
Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transforn.er GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:
"A potential problem can exist if the net te primary windings of the excitation pc DUPLICATE DOCUMENT to as the control,ower transformer (CPT,'
Entire document previousi entered into system under K6627gfgtj ANO 1049 1B or eases: -