Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C680
Person / Time
Site: Big Rock Point, Palisades  File:Consumers Energy icon.png
Issue date: 09/12/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 7909270222
Download: ML19208C680 (1)


Text

f/{

>* *touq'o'%

UNITED STATES E"

NUCLEAR REGULATORY COMMISSION m

E REGION lil a

U[

799 ROOSEVELT ROAD S

GLEN ELLYN. ILLINOIS 60137 o

W 12 upr Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN:

Mr. R. B. DeWitt Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:

Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, CL u % }& -n0w

%mesG.KdpTer Director

Enclosure:

IE Bulletin No. 79-23 cc w/ encl:

Mr. C. J. Hartman, Plant Superintendent Mr. J. G. Lewis, Manager Central Files Director, NRR/0PM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Anthony Roisman, Esq., Attorney Myron M. Cherry, Chicago 1049 123 7909270

Accession No. 7908220104 SSINS No.:

6820 UNITED STATE',

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORJEMENT WASHINGTON, [,.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problam encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.

Approxinately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at tnat point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 MA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:

"A potential problem can exist if the n.

the primary windings of the excitation 1 DUPLICATE DOCUMENT to as the control power transformer (CP' Entire document previously l

entered into system under:

l r

ANO WOWZ20/04

{

1049 124 No. or geges.

c

,!