ML19208C679
| ML19208C679 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 09/12/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 7909270221 | |
| Download: ML19208C679 (1) | |
Text
77C h
'o UNITED STATES E'
NUCLEAR REGULATORY COMMISSION g
e r REGION 111 o
799 ROOSEVELT ROAD o
GLEN ELLYN. ILLINOIS 60137
- s**
yn w,
,,3 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, Wb 0
VJames G. k ^g Keppler Director
Enclosure:
IE Bulletin No. 79-23 cc w/ enc 1:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. North Myron M. Cherry, Chicago 1049 \\2\\
u 7 909 2 7 0 L-4
Accession No. 7908220104 SSINS No.:
6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 12, 1979 IE Bulletin No. 79-23 4
POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:
Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.
Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.
Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.
The following nameplate data applies to the equipment installed at Turkey Point:
Emergency Diesel Generator General Motors (Electro-Motive Division)
Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:
a' + % aaaa*=+a- =ad +ha nantral M _
"A potential problem can exist if the na'
" ~
~~~~
tht primary windings of the excitation to as the control power transformer (CP DUPLICATE DOCUMENT Entire document previously entered into system under: