Text
N
'o UNITED STATES 8"3 NUCLEAR REGULATORY COMMISSION n
{
E REGION 111 o,
799 ROOSEVELT ROAD g.....,[
GLEN ELLYN. ILUNOIS 60137
[>
6 Decket Nos. 50-10, 50-237, 50-249, 50-254, 50-265, 50-295, 50-304, 50-373, 50-374, 50-454, 50-455, 50-456 and 50-457 Commonwealth Edison Company
. ATTN:
Mr. Byron Lee, Jr.
Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
Enclosed is IE Bulletin No. 79-23 which requires action by you with regard to your power reactor facilities with an operating license or a construction permit.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, bga - =0 -
VJames G. Ke}Ypler Director
Enclosure:
IE Bulletin No. 79-23 cc w/ encl:
Mr. B. B. Stephenson, Mr. R. Cosaro, Project Station Superintendent Superintendent Mr. N. Kalivianakis, Central Files Station Superintendent Director, NRR/DPM Mr. N. Wandke, Station Director, NRR/ DOR Superintendent PDR Mr. L. J. Burke, Site Local PDR Project Superintendent NSIC Mr. T. E. Quaka, Quality TIC Assurance Supervisor Anthony Roisman, Esq.,
Mr. R. ii. Holyoak, Station Attorney Superintendent Mr. Dean Hansell, Office Mr. Gunner Sorensen, Site of Assistant Attorney Project Superintendent General 1049 088 7009270 4b
t Accession No. 7908220104 SSINS No.:
6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEffnT WASHINGTON, D.C.
20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:
Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.
Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.
Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.
The following nameplate data applies to the equipment installed at Turkey Point:
Emergency Diesel Generator General Motors (Electro-Motive Division)
Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommendations regarding the above problem are described below:
"A potential problem can exist if the ne '
l th~e primary windings of the excitation p DUPLICATE DOCUMENT to as the control power transformer (CPT l
Entire document previously entered into system under:
ANO N 0622oIO4 No. of pages:
[
1049 089 m..
..