ML19208C622

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C622
Person / Time
Site: Summer 
Issue date: 09/12/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 7909270152
Download: ML19208C622 (1)


Text

s

/

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION n

s e

REGION 11 o

101 MARIETTA ST., N.W., SulTE 3100 ATLANTA, GEORGIA 30303

- rpf%

o SEP 121979 In Reply Refer To:

RII;JP0

[395,)

South Carolina Electric and Gas Company Attn:

T. C. Nichols, Jr., Vice President Power Production and System Operations P. O. Box 764 Columbia, South Carolina 29218 Gentlemen:

Enclosed is IE Bulletin 79-23 thtch requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questionc regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, h

y

'>k James P. O'Reilly Regional Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months e

1050 139 790927016>

Accession No. 7908220104 SSINS No.:

6820 UNITED STATEC NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their

'Iurkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and ietuun are described below:

ji DUPLICATE DOCUMENT "A potential problem can exist if the nl E

Entire document previously entered the primary windings of the excitation j into system under:

to as the control power transformer (CP r

ANO b

No. of Pages:

1050 140 3- - m m u -

.