ML19208C620

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C620
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/12/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 7909270149
Download: ML19208C620 (1)


Text

-

r UNITED STATES

'o*t NUCLEAR REGULATORY COMMISSION a e REGION 11 g

/[

101 MARIETTA ST., N.W., SUITE 3100 o,

ATLANTA, GEORGIA 30303 SEP 121979 In Reply Refer To:

1pk RII:JPO QO-395' South Carolina Electric and Gas Company Attn:

M. C. Johnson, Vice President Special Services and Purchasing P. O. Box 764 Columbia, South Carolinc 29218 Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, Y h k

'2 James P. O'Reilly Regional Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins issued in the Last Six Months 7909270i97 1050 135

SEP 121979 e

South Carolina Electric and Gas Company cc w/ enc 1:

T. B. Conners, Jr.

Conners, Moore and Corber 1747 Pennsylvania Avenue, N.W.

Washington, D.C.

20006 A. A. Smith Quality Assurance Post Office Box 8 Jenkinsville, South Carolina 29065 O. S. Bradham, Manager Nuclear Operations Post Office Box 8 Jenkinsville, South Carolina 29065 g

1050 136

Accession No. 7908220104 SSINS No.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 12, 1979 IE Bulletin No. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility. Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exciter Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recommen are described below:

, DUPLICATE DOCUMENT "A potential problem can exist if the ne lEntire document previously entered the primary windings of the excitation pl 'nto system under:

to as the control power transformer (CPT No. of pages:

7 1050 137 4ea: = = a _ ~ a