Forwards IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Action Required
ML19208C575
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/12/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 7909270097
Download: ML19208C575 (1)


Text

a arc yf

'o, UNITED STATES NUCLEAR REGULATORY COMMISSION y ' ).o g

g.' i e

REGION I 8

631 PARK AVENUE 0,

8

,o KING OF PRUSSIA, PENNSYLVANIA 19406

+...*

Docket No. 50-271 SEP 121979 Vermont Yankee Nuclear Power Corporation ATTN:

Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westborough, Massachusetts 01581 Gentlemen:

Enclosed is IE Bulletin 79-23 which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction pe mit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely,

_a PK w

oyce H. Grier

/ Director

Enclosures:

1.

IE Bulletin No. 79-23 2.

List of IE Bulletins Issued in the Last Six Months cc w/encls:

W. F. Conway, Plant Superintendent Ms. J. Abbey, Technical Secretary A. Z. Roisman, Natural Resources Defense Council 1049 344 7909270b ]

ENCLOSURE 1 Accession No. 7908220104 SSINS No.:

6820 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-23 Date:

September 12, 1979 Page 1 of 3 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER Description of Circumstances:

Florida Power and Light Company recently reported a problem encountered during a 24-hour full load test of the emergency diesel generators (EDG) at their Turkey Point facility.

Approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> into the test, the A-EDG tripped due to a differential-relay lockout on B and C phases; the B-EDG was manually stopped, thus interrupting the test at that point in time.

Subsequent investigation and testing by the licensee revealed a design error on both the A and B EDGs which resulted in overheating of the Exciter Power Transformers (EPTs) at sustained high load operation.

The following nameplate data applies to the equipment installed at Turkey Point:

Emergency Diesel Generator General Motors (Electro-Motive Division)

Model EMD-999-20 Engine-turbocharged, 2 cycle, EMD design 20-645E4 Generator-EMD-design Model A-20 Exci'.er Power Transformer GE-single phase Model-9T24Y1004 Serial-MD Cycles-60 KVA 15 Insulation-4160 V The manufacturer's findings and recomm are described below:

DUPLICATE DOCUMENT Entire document previously entered into system under:

79098924/6V 'l wO 3

l 1049 345 No. a vases:

_