Forwards IE Insp Repts 50-245/79-13 & 50-336/79-17 on 790514-18 & 0529-0601.No Noncompliance Noted
ML19208B930
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/25/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19208B931 List:
References
NUDOCS 7909240175
Download: ML19208B930 (2)


See also: IR 05000245/1979013

Text

T4

..

p ngq

UNITED STATES

'o

NUCLEAR REGULATORY COMMISSION

[

[o

REGION I

$(I

/,h

$31 PARK AVENUE

f

KING OF PRUSSIA, PENNSYLVANIA 19406

% ,. /

....

Docket Nos. 50-245

JUL 251379

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Combined Inspection 50-245/79-13 and 50-336/79-17

This refers to the inspection conducted by Mr. R. Feil of this office on

May 14-18, 29 - June 1, 1979, at Millstone Nuclear Power Station, Waterford,

Connecticut, of activities authorized by NRC License Nos. DPR-21 and DPR-65

and to the discussions of our findings held by Mr. Feil with Mr. J. Opeka

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such infonnation from public

disclosure.

Any such application must be accompanied by an affidavit

executed by the owner of the infonnation, which identifies the document or

part sought to be withheld, and which contains a statement of reasons which

addresses with specificity the items which will be considered by the Conmission

as listed in subparagraph (b)(4) of Section 2.790.

The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

383287

<

79092(017 9

.,

..

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcenent Combined Inspection

Report Numbers 50-245/79-13 and 50-336/79-17

cc w/ encl:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Hinne1 wright, Licensing Safeguards Engin'er

A. Z. Roisman, Natural Resources Defense CouncC (Without Report)

383268

^