ML19208B897
| ML19208B897 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/07/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| References | |
| NUDOCS 7909240123 | |
| Download: ML19208B897 (1) | |
Text
PL h
y[p" "c,.'{o UNITED STATES o
y } j#./..f( g NUCLEAR REGULATORY COMMISSION 5:
s t
REGION lil 0,
8 799 ROOSEVELT ROAD
,o GLEN ELLYN, ILLINolS 60137 SEP 7 69 Docket No. 50-461 Docket No. 50-462 Illinois Power Company 437N:
Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:
The enclosed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin.
If you desire additional information regarding this matter, please contact this office.
Sincerely,
'lp,.a > h$g3k sJames G. Keppler Director
Enclosure:
Supplement 2 to IE Bulletin No. 79-14 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General O
88322G
(>3 7909240gg s
SSINS:
6820 Accesstion No.: 7908220109 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 September 7, 1979
~
IE Bulletin No. 79-14 Supplement 2 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:
IE Bulletin No. 79-14 was issued on July 2, revised on July 18, and first supplemented on August 15, 1979.
The bulletin requested licensees to take certain actions to verify that seismi analyses are applicable to as-built plants.
Supplement 2 provides the following additional guidance with regard to implementation of the bulletin requirements:
Nonconformances One way of satisfying the requirements of the bulletin is to inspect safety-related piping systems against the specific revisions of drawings which were used as input to the seismic analysis.
Some architect-engineers (A-E) however, are recommending that their customers inspect these systems against the latest revisions of the drawings and mark them as necessary to define the as-built configuration of the systems.
These drawings are then returned to the AE's offices for comparison by the analyst to the seismic analysis input.
For licensees taking this approach, the seismic analyst will be the person who will identify nonconformances.
The first supplement to the bulletin provided guidance with regard to evaluation of nonconformances.
That guidance is appropriate for licensees inspecting against later drawings. The licensee should assure that he is promptly notified when the AE identifies a nonconformance, that the initial engineering judgment is completed in two days and that the analytical engineering evaluation is completed in 30 days.
If either the engineering judgement or the analytical engineering evaluation indicates that system operability is in jeopi.rdy, the licensee is expected to meet the applicable technical specification action statement.
Visual Approximations Some licensees are visually estimating pipe lengths and other inspection elements, and have not documented whic i
Visual estimation of dimensions is not,'. DUPLICATE DOCUMENT where visual estimates are used, the adi ante requirements.
Further, in docume 9 NMD ically identify those data that were v dEntire document previously entered Cinto system under:
4 79O8M O/07 i
ANO t
No. of pages:
)
Ii _...
t