Forwards IE Bulletin 79-14,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys
ML19208B894
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/07/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7909240118
Download: ML19208B894 (1)


Text

i

  1. p >* a'Goq'o,,

s UNITED STATES NUCLEAR REGULATORY COMMISSION n

/. $

REGION lit o,

[

799 RooSEVE LT ROAD v

e GLEN ELLYN,lLLINolS 60137

,o SEP 7 1979 Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

The enclosed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin.

If you desire additional inforrcation regarding this matter, please contact this office.

Sincerely, Q,.~ h: l63 :b' ~

., James G. Kepp er Director

Enclosure:

Supplement 2 to IE Bulletin No. 79-14 cc w/ encl:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney S83222 7909240\\\\% ;

SSINS:

6820 Accesstion No.: 7908220109 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 7, 1970 IE Bulletin No. 79-14 Supplement 2 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:

IE Bulletin No. 79-14 was issued on July 2, revised on July 18, and first supplemented on August 15, 1979.

The bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants.

Supplement 2 provides the following additional guidance with regard to implementation of the bulletin requirements:

Nonconformances One way of satisfying the requirements of the bulletin is to inspect safety-related piping systems against the specific revisions of drawings which were used as input to the seismic analysis.

Some architect-engineers (A-E) however, are recommending that their customers inspect these systems against the latest revisions of the drawings and mark them as necessary to define the as-t'uilt configuration of the systems.

These drawings are then returned to the AE's offices for comp;>ison by the analyst to the seismic analysis input.

For licensees taking this approach, the seismic analyst will be the person whu will identify nonconformances.

The first supplement to the bulletin provided guidance with regard to evaluation of nonconformances.

That guidance is appropriate for licansees inspecting against later drawings.

The licensee should assure that he is promptly notified when the AE identifies a nonconformance, that the initial engineering judgment is completed in two days and that the analytical engineering evaluation is completed in 30 days.

If either the engineering judgement or the analytical engineering evaluation indicates that system operability is in jeopardy, the licensee is expected to meet the applicable tachnical specification action statement.

Visual Approximations Some licensees are visually estimating pipe lengths and other inspection elements, and have not documented whi Visual estimation of dimensions is not' where visual estimates are used, the DUPLICATE DOCUMENT gyg ante requirements.

Further, in docum itally identify those data that were Entire document previously encered into system tinder:

Nd82 C/d 7 ANO No. of pages:

[