Forwards IE Bulletin 79-14,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys
ML19208B888
Person / Time
Site: Midland
Issue date: 09/07/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 7909240110
Download: ML19208B888 (1)


Text

[gaarc, o

'o UNITED STATES E , f.q [,j NUCLEAR REGULATORY COMMISSION gp 71979 c

REGION lli

[

o,,

A 799 ROOSEVELT ROAD e

GLEN ELLYN, lLLINOIS 60137 Docket No. 50-329 Docket No. 50-330

. Consumers Power Company ATTN:

Mr. Stephen H. Howell Vice President

^

1945 West Parnall Road Jackson, MI 49201 Gentlemen:

The enc 1csed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

/}JamesG.KeppIernu D l$yyk Director

Enclosure:

Supplement 2 to IE Bulletin No. 79-14 cc w/ encl:

Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. North Myron M. Cherry, Chicago S83210 7909240110

SSINS:

6820

{

Accesstion No.: 7908220109 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 September 7, 1979

~

IE Bulletin No. 79-14 Supplement 2 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Description of Circumstances:

IE Bulletin No. 79-14 was issued on July 2, revised on July 18, and first supplemented on August 15, 1979.

The bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants.

Supplement 2 provides the following additional guidance with regard to implementation of the bulletin requirements:

Nonconformances One way of satisfying the requirements of the bulletin is to inspect safety-related piping systems against the specific revisions of drawings which were used as input to the seismic analysis.

Some architect-engineers (A-E) however, are recommending that their customers inspect these systems against the latest revisions of the drawings and mark them as necessary to define the as-built configuration of the systems.

These drawings are then returned to the AE's offices for comparison by the analyst to the seismic analysis input.

For licensees taking this approach, the seismic analyst will be the person who will identify nonconformances.

The first supplement to the bulletin provided guidance with regard to evaluation of nonconformances.

That guidance is appropriate for licensees inspecting against later drawings.

The licensee should assure that he is promptly notified when the AE identifies a nonconformance, that the initial engineering judgment is completed in two days and that the analytical engineering evaluation is completed in 30 days.

If either the engineering judgement or the analytical engineering evaluation indicates that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement.

Visual Approximations Some licensees are visually estimating pipe lengths and other inspection elements, and have not documented which data have b m~

Visual estimation of dimensions is not where visual estimates are used, the ac DUPLICATE DOCUMENT o

ante requirements.

Further, in documen f Entire document Previou gy py g ed

( g ically identify those data that were vil iinto system under:

Ob OY ANO S

i No. of Pages:

i