ML19208B714

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation of Electrical,Instrumentation & Control Aspects of Overpressure Protection Sys
ML19208B714
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/14/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19208B715 List:
References
TASK-05-03, TASK-RR NUDOCS 7909210259
Download: ML19208B714 (1)


Text

_.___ _

narco o

UNITED STATES g

m NUCLEAR REGULATORY COMMISSION O

E WASHINGTON. D. C. 20555

(

[

AUG 141979 MEMORANDUM FOR:

D. Ziemann, Chief, Operating Reactors Branch #2, Division of Operating Reactors FROM:

G. Lainas, Chief, Plant Systems Branch, Division of Operating Reactors

SUBJECT:

HADDAM NECK: EVALUATION OF THE ELECTRICAL, INSTRUMENTATION AND CONTROL ASPECTS OF THE OVERPRESSURE PROTECTION SYSTEM (TAC 7053)

In accordance with your request per TAC 7053, enclosed is the Pl 1t Systems Branch Safety Evaluation Report pertaining to the Hamdam Neck overpressure protection system.

G. Lainas, Chief

/ Plant Systems Branch Division of Operating Reactors

Contact:

P. Shemanski, X28077

Enclosure:

Safety Evaluation Report cc w/ enclosure:

D. Eisenhut G. Lanik

x. Vollmer D. Tondl B. Grimes P. Shemanski D. Davis PSB Section A T. Wambach G. Lainas D. Mcdonald G. Zech P. Check T. Marsh J. Rosenthal 373012 7909210957