ML19208B703

From kanterella
Jump to navigation Jump to search
Notifies of Continued Investigation Re Inadequate Pipe Supports as Related to Seismic Requirements
ML19208B703
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/10/1979
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
TXX-3024, NUDOCS 7909210226
Download: ML19208B703 (1)


Text

MO TENAS UTILITIES GENERATING CO.TIPANY 2tMn DRYAN TOWEH + D alt.AM.'l EX AS 7.i2OI August 10, 1979 R J GARY

".'M::a.9 ::".:::'

fer . W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Pyan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arling on, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PIPE SUPPORTS FILE N0. 10110

Dear Mr. Seidle:

On May 18, 1979, we verbally informed your Mr. R. G. Taylor that pipe supports as presently designed may not meet seismic requirements. We considered this~"potentially" reportable under 10 CFR 50.55(e).

We are continuing our investigation and evaluation and will notify you as soon as we have reached a conclusion.

Very truly yours, R. J. Gary RJG:dla cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

[yy8260 909210 2 N '