Forwards IE Circular 79-18, Proper Installation of Target Rock Safety Relief Valves. No Action Required
ML19208B661
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/10/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 7909210147
Download: ML19208B661 (1)


Text

CENTRAL FILES g{#"" %,o,,

PDR:HQ UNITED STATES y'

'g NUCLEAR REGl'LATORY COMMISSION 3'

j i2GION IV NSIC 0,

s G11 RYAN PLAZA DRIVE, SUITE 1000

  1. 'g

,e AR LINGToN, TEXAS 76012 September 10, 1979 Docket No. 50-267 Public Service Company of Colorado ATTN:

Mr. C. K. Millen Senior Vice President P. O. Box 840 Denver, Colorado 80201 Gentlemen:

The enclosed IE Circular No. 79-18 is forwarded to you for information.

No written response is required. Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely,

/

  • '"-4 Karl V. Seyfrit f Director

/

Enclosures:

1.

IE Circular No. 79-18 2.

List of IE Circulars Issued in Last Six Months cc:

D. W. Warembourg, Nuclear Production Manager Fort St. Vrain Nuclear Station P. O. Box 368 Platteville, Colorado 80651 L. Brey, Manager, Quality Assurance 38;069 q909210/9/

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Circular No. 79-18 Date:

September 10, 1979 Page 1 of 2 PROPER INSTALLATION OF TARGET ROCK SAFETY-RELIEF VALVES Description of Circumstances:

As a result of NRC monitoring of operating experiences involving the Target Rock safety-relief valve, two potential problems have been identified. One potential problem is that the performance of the valve has been found to be impaired by either excessive or insufficient insulation around the valve body when installed in its service environment. The other potential problem is that improper assembly of the modified valve can rest it in inoperability. of the remote air actuator.

The Target Rock safety-relief valve is a dual purpose valve in that overpressure response is provided by pilot valve action and automatic depressurization (ADS) is provided by a remote air actuator. Valve operation has been found to be affected by the amount of insulation placed around the valve body. A previous IE Bulletin No. 76-06 was issued on July 21, 1976, as a result of operating experiences where excessive insulation was installed on the valve.

The excessive insulation caused excessive heat to be retained producing a higher temperature environment for the elastomeric diaphragm which resulted in accelerated deterioration of the elastomer. Failure of the elastomeric diaphragm makes the valve inoperable in the power-operation mode (i.e., manual and ADS).

Subsequently, a silicone-nomex diaphragm was developed by the manufacturer to provide a longer life in high temperuture environments.

In addition, the IE Bulletin explicitly required that insulation be installed in accordance with the manufacturer's recommendations.

A recent licensee event report from the Monticello facility identified a potential problem resulting from insufficient insulation (i.e., just opposite of the condition addressed by IE Bulletin 76-06). During the performance of special testing of the response to safety-relief valve operation, a valve was discovered to be exceeding its design delay time for opeaing. Subsequent inspection and testing of the valve revealed that insufficient insulation may cause condensation to accumulate in the pressure venting ports which then results in delaying the opening of the main disk. This slower response time is significant with respect to primary system overpressure and similar transient response analyses. Although the repo three-stage Target Rock safety-relief of insulation are similarly applicabl DUPLICATE DOCUMENT valves.

[$@j.;().9()

Entire document previously entered into system under:

ANO NO $2CO 3%

No. of pages:

4/

..