ML19208B578
| ML19208B578 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/30/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Grant TOLEDO EDISON CO. |
| Shared Package | |
| ML19208B579 | List: |
| References | |
| NUDOCS 7909210028 | |
| Download: ML19208B578 (2) | |
See also: IR 05000346/1979011
Text
'o,
UNITED STATES
E'
',
NUCLEAR REGULATORY COMMISSION
'
3 ,,
c,
$
c [E
REGION 111
S
799 ROOSEVELT ROAD
%,
e
GLEN ELLYN, ILLINOIS 60137
JUL 3 01979
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. James S. Grant
Vice President - Energy
Supply
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of this office
on May 24-25, 31, and June 1, 5-7, 20-22, 1979, at Davis-Besse Nuclear
Power Station, Unit 1, and at ycur corporate office; on July 2,1979, at
the Bechtel Power Corporation, Gaithersburg, Maryland, office authorized
by NRC License No. NPF-3 and to the discussion of our findings with
Mr. L. E. Roe, and others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
3/ld.5NI
0921 00 %
,.
Toledo Edison Company
-2-
JUL 3 0 G79
.
We will gladly discuss at.; questions you have concerning this
inspection.
Sincerely,
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-346/79-11
cc w/ encl:
T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Ohio
Power Siting Commission
Helen W. Evans, Director,
Division of Power Generation
3 sb.$$U3