Forwards IE Insp Rept 50-346/79-11 on 790524-25,31,0601, 05-07,20-22 & 0702.No Noncompliance Noted
ML19208B578
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/30/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
Shared Package
ML19208B579 List:
References
NUDOCS 7909210028
Download: ML19208B578 (2)


See also: IR 05000346/1979011

Text

'o,

UNITED STATES

TIC

E'

',

NUCLEAR REGULATORY COMMISSION

'

3 ,,

c,

$

c [E

REGION 111

S

799 ROOSEVELT ROAD

%,

e

GLEN ELLYN, ILLINOIS 60137

JUL 3 01979

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this office

on May 24-25, 31, and June 1, 5-7, 20-22, 1979, at Davis-Besse Nuclear

Power Station, Unit 1, and at ycur corporate office; on July 2,1979, at

the Bechtel Power Corporation, Gaithersburg, Maryland, office authorized

by NRC License No. NPF-3 and to the discussion of our findings with

Mr. L. E. Roe, and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

3/ld.5NI

0921 00 %

,.

Toledo Edison Company

-2-

JUL 3 0 G79

.

We will gladly discuss at.; questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-346/79-11

cc w/ encl:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio

Power Siting Commission

Helen W. Evans, Director,

Division of Power Generation

3 sb.$$U3