Forwards IE Insp Rept 70-1100/79-03 on 790328-30 & Notice of Violation
ML19208B394
Person / Time
Site: 07001100
Issue date: 06/15/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lichtenberger H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML19208B391 List:
References
NUDOCS 7909200162
Download: ML19208B394 (2)


Text

.>.

pa nrog[%,

[

UNITED STATES y })

(( g NUCLEAR REGULATORY COMMISSION ti ? \\

REGION 1

/A[E t, '

631 PARK AVENUE

%O

,o KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 70-1100 JUN 151973 Combustion Engineering, Inc.

ATTN:

Mr. H. V. Lichtenberger Vice President - Nuclear Fuel Nuclear Power Systems - Manufacturing P. O. Box 500 Windsor, Connecticut 06095 Gentlemen:

Subject:

Inspection 70-1100/79-03 This refers to the inspection conducted by Mr. P. Clemons of this office on March 28-30, 1979, of activities authorized by NRC License No. SNM-1067 and to the discussions of our findings held by Mr. Clemons with Mr. F. Pianki at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, measurements made by the inspector, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the item of noncompliance brought to your attention in a letter dated November 1, 1978.

We have no further questions regarding your action at this time.

Baced on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels as described in our correspondence to you dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal R'egulations.

Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including:

(1) corrective ' steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclo-sures will be placed in the NRC's Public Document Room.

If this report g

  • O fG 790920\\

+

H0to O SL

Combustion Engineering, Inc.

2 contains any information that you (or your contractor) believe to be pro-prietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

Any such application must be accompanied by an affidavit executed by the owner of the information, which identified the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790.

The information sought to be withheld'shall be incor -

porated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/

George H. Smit, Chief Fuel Facility and Materia Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation 2.

Office of Inspection and Enforcement Inspection Report Number 70-1100/79-03 cc w/encls:

Mr. W. P. Chernock, Vice President of Development Combustien t ' ] [q bh