ML19208B261
| ML19208B261 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 07/06/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19208B250 | List: |
| References | |
| NUDOCS 7909190428 | |
| Download: ML19208B261 (2) | |
See also: IR 05000518/1979012
Text
9
a Mcg'o
n
UNITED STATES
! ' , y., ( [ ,j
NUCLEAR REGULATORY COMMISSION
'
" ..
REGION ll
[
101 MARIETTA sT., N.W., sulTE 3100
o, -- ~
C
' %.s
o
ATLANTA, G EoRGIA 30303
.....
JUL 0 61979
.
In Reply Refer To:
,
RII:JJB
50-518/79-12
50-519/79-12
50-520/79-12
50-521/79-12 -
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by J. J. Blake of this office on June 4-7,
1979, of activities authorized by NRC Construction Permit Nos. CPPR-150, CPPR-151,
CPPR-152 and CPPR-153 for the Hartsville Unit A1, A2, and B1 and B2 facilities,
and to the discussion of our findings held with R. T. Hathcote at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
persennel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taten by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application sust include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
?OO
'
_
-m,eu
mw
_.
-
.-.
.
.
JUL 0 61973
Tennessee Valley Authority
-2-
.
that proprietary information identified in the application is contained in a
separatepartoftAedocument. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
. +d
C. E. Ifurphy,
ef
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-518/79-12,
50-519/79-12, 50-520/79-12 and
50-521/79-12
cc w/ enc 1:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
R. T. Hathcote, Project Manager
P. O. Box 2000
Hartsville, TN 37074
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee
37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
'NU
?O
- _ _.
_
. _ -
. - .
--.
.
- - -
.