Text
urtc rog-fj
/
'o UNITED STATES 8
s., ( [ g NUCLEAR REGULATORY COMMISSION g
=
\\W g
WASHINGTON, D. C. 20555 o
ii
% +'.U...#
August 17, 1979 Jocket No.
Mr. Al an R. Barton Senior Vice President Alabama Power Company Post Office Box 2641 Bimingham, Alabama 35291
Dear Mr. Barton:
In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection.
Since that time, you have perfomed a fire hazards analysis for your facility and have compared its fire protection program with the NRC guidelines.
In late 1976, we set October 1980 as the date for completing the implementation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications. For example, minor modifications, adoption of administrative controls and additional portable equipment would be completed within six months; however, major modifications would require a year or more to complete and some modificatiers would be coordinated with refueling outages.
By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.
We urge you to apply your best efforts to maintain your schedules for caipletion of all of the fire protection modifications at your facility and to submit, on an expedited basis, any infomation that is still outstanding with rePrd to open items and required design detafis.
Sincerely,
/
1 gc y
- 'n Darrell G. Eisenhut, Acting Director
' Division of Ccerating Reactors Office of !!uclear Reactor Regulation cc-See next page
'l h h b0 790929"/7 2 p
x
,/
Mr. Alan R. Barton Alabama Power Company cc: Ruble A. Thomas, Vice President Southern Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 John Bingham, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward 600 North 18th Street Birmingham, Alabama 35202 Edward H. Keiler, Esquire Keiler and Buckley 9047 Jefferson Highway River Ridge, Louisiana 70123 George S. Houston Memorial Library 212 W. Burdeshaw Street Dothan, Alabama 36303 966 339
-