ML19208B102

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-518/79-14,50-519/79-14, 50-520/79-14 & 50-521/79-14 on 790709-12.No Noncompliance Noted
ML19208B102
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 07/24/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parvis H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19208B103 List:
References
NUDOCS 7909190055
Download: ML19208B102 (2)


See also: IR 05000518/1979014

Text

pa af og'o

/Q

'

![y , ,'A[ g

UNITED STATES

7/

NUCLEAR REGULATORY COMMISSION

kO 4'3

-

e

REGION 11

~

(Wg

[ ' "h

f

g

101 MARIETTA sT., N.W., sulTE 310o

o

ATLANT A, GEORGI A 30303

%O

/

N ,:

3, '4 41W3

gp/

    • "*

In Reply Refer To:

RII:EHG

50-518/79-14

50-519/79-14

50-520/79-14

50-521/79-14

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by E. H. Girard of this office on

July 9-12, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant

facility, ara to the discussion of our findings held with R. T. Hathcote at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of proceduras and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

N (JOS5--

9

m

263

JUL 241979

.

Tennessee Valley Authority

-2-

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

N

C. E. Murphy, Chief

Reac'.or Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-518/79-14,

50-519/79-14, 50-520/79-14 and 50-521/79-14

cc w/ encl:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 37401

R. T. Hathcote, Project Manager

P. O. Box 2000

Hartsville, TN 37074

J. F. Cox

400 Cocunerce Street

W10C131 C

Knoxville, Tennessee

37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

(; 6[g

2bk