Text
pa af og'o
/Q
'
![y , ,'A[ g
UNITED STATES
7/
NUCLEAR REGULATORY COMMISSION
kO 4'3
-
e
REGION 11
~
(Wg
- [ ' "h
f
g
101 MARIETTA sT., N.W., sulTE 310o
o
ATLANT A, GEORGI A 30303
%O
/
N ,:
3, '4 41W3
gp/
- "*
In Reply Refer To:
RII:EHG
50-518/79-14
50-519/79-14
50-520/79-14
50-521/79-14
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by E. H. Girard of this office on
July 9-12, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant
facility, ara to the discussion of our findings held with R. T. Hathcote at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of proceduras and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
N (JOS5--
9
m
263
JUL 241979
.
Tennessee Valley Authority
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
N
C. E. Murphy, Chief
Reac'.or Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-518/79-14,
50-519/79-14, 50-520/79-14 and 50-521/79-14
cc w/ encl:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
R. T. Hathcote, Project Manager
P. O. Box 2000
Hartsville, TN 37074
J. F. Cox
400 Cocunerce Street
W10C131 C
Knoxville, Tennessee
37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
(; 6[g
2bk