i

,

.

.

%-

pn

UNITED STATES

So

NUCLEAR REGULATORY COMMisslON

[

o

REGION I

$

g

631 PARK AVENUE

g

x:NG OF PRUSSI A, PENNSYLVANIA 19404

  • ..../

Docket No. 50-320

J1in 2 8 B19

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President.

P. O. Box 542

Reading, Pennsylvania

19603

Gentlemen:

_

Subject:

Inspection 79-09

This refers to the inspection conducted by Mr. G. Walton of this office on April

13 thru 30,1979 at Three Mile Island, Unit 2, Middletown, Pa. of activities

authorized by NRC License No. OPR-73 and to the discussions of our findings held

by Mr. Walton with Mr. J. Wright of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were issued.

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2. Title

10, Code of Federal Regulations, a copy of this letter and the enclosed in

spection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must be accompanied by an affidavit executed by the owner of the

~

information, which identifies the document or part sought to te withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be cons,idered by the Commission as listed in subparagraph (b)(4) of

Section 2.790. The information sought to be withheld shall bo incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

C86

02?

q909190

. . .

g

..

~

i

.

.

,

.

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Y

/

Robert T. Carlson, Chief

Reactor Construction and Engineering

,

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

-

'

Report Number 79-09

_

cc w/ encl:

E. G. Wallace, Licensing Manager

J. J. Barton, Project Manager

R. C. Arnold, Vice President - Generation

L. L. Lawyer, Manager - Generation Operations

G. P. Miller, Manager - Generating Station - Nuclear

J. B. Logan, Unit 2 Superintendent

G. A. Kunder, Unit 2 Superintendent - Technical Support

I. R. Finfrock, Jr.

Mr. R. Conrad

G. F. Trowbridge, Esquire

tiiss Mary V. Southard, Chairman, Citizens for a Safe Environment

(WithoutReport)