ML19208B053
| ML19208B053 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/20/1979 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7909180567 | |
| Download: ML19208B053 (1) | |
Text
/
IC DUKE POWEH COMPANY
- f POWEn Ut'ILDING 422 SocTn Cuencu StaEET, CauntoTTE, N. C.
.o 22 :, 9. 2 0 wiL LI AM O. PA R et E R, J R.
v.c, P.c..ccar August 20, 1979 tc.c.-e c 4 c.7c4 373 4063 St rane Pacouctiog Mr. J. P. O'Reilly, Dirntor U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 Re: McGuire Nuclear Station, Units 1 and 2 IE Bulletin 79-02, Revision 1 Docket Nos. 50-369, 50-370
Dear Mr. O'Reilly:
My letter of August 14, 1979, forwarded to your office a copy of Teledyne Engineering Services Technical Report TR-3501-1.
This report contains the results of the cyclic testing which was performed at McGuire per the require-ments of the referenced IE Bulletin.
In a telephone conversation between Mr. R. B. Priory of Duke Power Company and Mr. W. P. Ang of your office, Duke was informed that a single submittal of this report would be sufficient for replies to this bulletin on all of Duke's nuclear stations. For this reason, my submittal of this report on August 14, 1979, is referenced as Duke's final response to this bulletin for McGuire.
Very truly yours, w
William O. Parker, Jr.
GAC/sch cc:
U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, DC 20555
"})]
-i o*'" *%s,s t
5
\\
Anniversar
- % psly GYYiCU.L CC (_
7909180 f67