ML19208A981

From kanterella
Jump to navigation Jump to search
Notifies That Installation of Addl Neutron Shielding Using Same Design as Existing Shielding Is Planned During Upcoming Refueling Outage
ML19208A981
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/14/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
262A, NUDOCS 7909180381
Download: ML19208A981 (1)


Text

VxnorarA Ex.ncTnte AND Powen COMPANY Rrczzuown.VzuotwzA nonst September 14, 1979 Mr. Ja=es P. O'Reilly, Director Serial No. 262A Office of Inspection and Enforcement P0/RMI:baw U. S. Nuclear Regulatory Commission Docket No. 50-338 Region II License No. NPF-4 ,

101 Marietta Street, Suite 3100 _

Atlanta, Georgia 30303 .. ..

Dear Mr. O'Reilly:

In our letter of May 5,1978, (LER 78-33/0lT-0) we notified you of higher than expected neutron dose rates being experienced at North Anna Power Station Unit No. I which were the result of neutron streaming from the n cinity of the reactor cavity. The intent of this letter is to infors you that we are planning the installation of supplementary neutron shielding utilizing the same design configuration as the shielding already installed in Unit No. 2. The shielding was described in our letter of January 31, 1979 (Serial No. 100A). It is our intention to install the shield during the upcoming reft eling outage scheduled for Unit No. 1.

Very truly yours, M $6

0. M. Stallings Vice President-Power Supply and Production Operations cc: Mr. Victor Stello, Director Office of Inspection and Enforcement Fr. Earold R. Denton, Director Office of Nuclear Reactor Regulation

% 1170 79091803 8.L 3;