Text
o mc
w#'o
UNITED STATES
l'
,. j
NUCLEAR REGUL ATORY COMMISSION
Y,g
- - W-V [,g
,
REGION 11
,
e
- kd
,5
101 MARIE TT A sT., N W., SUITE 3100
o,
AT L ANT A, GEORGI A 30303
.....f
'N..-
JUL 2 71979
In Reply Refer To:
RII:DKW
50-416/79-14
50-417/79-14
Mississippi Power and Light Company
ATTN:
N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
This refers to the inspection conducted by D. K. Walters of this office on
July 10-13, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-118 and CPPR-119 for the Grand Gulf facility, and to the discussion of our
findings held with P. W. Sly at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prenued so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
M 1b8
7909180
.
JUL 2 71979
Mississippi Power and Light
-2-
Company
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C
-
M C. E. Murphy, Chief
T
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-416/79-14
and 50-417/79-14
cc w/ encl:
C. K. McCoy, Plant Manager
P. O. Box 756
Port Gibson, MS 39150
358150
.