Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML19208A621
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/13/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 7909170088
Download: ML19208A621 (2)


Text

l[f

[pa aseg'o UNITED STATES g

NUCLEAR REGULATORY COMMISSION y

WASHINGTON, D. C. 20555 AUGUST I 3 1979 Docket Nos. 50-277 and 50-278 Mr. Edward G. Bauer, Jr., Esquire Vice President and General Counsel Ph.iladelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101

Dear Mr. Bauer:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection. Since that time, you have performed a fire hazards analysis for your facility and have compared its, fire protection program with the NRC guidelines.

In late 1976, we set October 1980 as the date for completing the implementation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications. For example, minor modifications, adoption of administrative controls and additional portable equipment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urge you to apply your best efforts to maintain your schedules for completiop of all of the fire protection modifications at your facility and to submit, on an expedited basis, any information that is still outstanding with regard to open items and required design details.

Sincer,ely, j

/,/,/

j' F

JWn i

@ p. Eisenhut, Acting Director

'y Division of 0 erating Reactors

, Dffice of Nuc ear Reactor Regulation I

cc:

See next page Nielil 7909170 Oh

Mr. Edward G. Bauer, Jr.

Philadelphia Electric Company 2_

AUGUST I 3 379 cc:

Eugene J. Bradley Philadelphia Electric Canpany Assistant General Counsel 2301 Market Street Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr.

1747 Pennsylvania Avenue, N. W.

Washington, D. C.

20006 Raymond L. Hovis, Esquire 35 South Duke Street York, Pennsylvania 17401 Warren K. Rich, Esquire Assistant Attorney General

. Department of Natural Resources Annapolis, Maryland 21401 Government Publications Section State Library of Pennsylvania Education Building Commonwealth and Walnut Streets Harrisburg, Pennsylvania 17126 M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Edward Greenman

'U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Peach Bottom Atomic Power Station P. O. Box 399 Delta, Pennsylvania 17314 Philadelphia Electric Company ATTN:

Mr. W. T. Ull rich Peach Bottom Atomic Power I'.ation Delta, Pennsylvania 17314 151,334

.