Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML19208A615
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/09/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Short T
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 7909170081
Download: ML19208A615 (2)


Text

__

pn nuouq

}g* f I) fi k

UNITED STATES NUCLEAR REGULATORY COMMISSION yg er g

gj g

E WASHINGTON, D. C. 20555

$. v /

August 9, 1979 Docket No. 50-285 Mr. Theodore E. Short Assistaat General Manager Cmaha Public Power District 1623 Harney Street Omaha, Nebraska 68102

Dear Mr. Short:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection.

Since that time, you have performed a fire hazards analysis for your facility and have compared its fire protection program with tne NRC guidelines.

In late 1976, we set October 1980 as the date for completing the imple-mentation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications. For example, minor modifications, adoption of administrative controls and additional portable equip-ment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Ccmmission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urge you to apply your best efforts to improve your schedules for calpletion of as many of the fire protection modifications at your facility as possible prior to October 1980 and to submit on an expedited basis any infor ation that is still outstanding with regard to open items and required design details.

S ncerely, N W/

LCr 2 ?

D. u senntt,

.ing D ec or Division of Cperating Reactors Office of Nuclear Reactor Regulation cc: See next page 7 0 0 fl 8012.Ml

Onana Public Power District cc:

lIargaret R. A. Paradis LeBoeuf, Lamb, Leiby & flacRae 1757 H Street, N.W.

Washington, D. C.

20036 Blair Public Library 1663 Lincoln Street Blair, Nebraska 68008 m

e 9

e m

O 9

h e

a f

%