Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML19208A600
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/13/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Whitmer C
GEORGIA POWER CO.
References
NUDOCS 7909170058
Download: ML19208A600 (2)


Text

a ano g

[o UNITED STATES g

NUCLEAR REGULATORY COMMISSION 3

e(

o

$g(

,E WASHINGTON, D. C. 20555

%;..dy.. /

AUGUST I 3 1979 Docket No. 50-366 Mr. Charles F. Whitmer Vice President - Engineering Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302

Dear Mr. Whitmer:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection. Since that time, you have performed a fire hazards analysis for your facility and have compared its fire protection program with the NRC guidelines.

In late 1976, we set October 1980 as the date f6r completing the implementation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications. For example, minor modifications, adoption of administrative controls and additional portable equipment would be completed within six months; however, major modifications would require a year or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urge you to apply your best efforts to maintain your schedules for completion of all of the fire protection modifications at your facility and to submit, on an expedited basis, any infomation that is still outstanding with regard to open items and required design details.

./

y t p //

Sin

/ /

a

. Eisenhut, Acting Director

/

Division of Operating Reactors N '

Office of Nuclear Reactor Regulation cc:

See next page 8 b.l.W?.

79097 7o c53

Mr. Charles F. Whitmer AUGUST 3 1979 Georgia Power Company

-2 cc:

G. F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Ruble A. Thomas Vice President P. O. Box 2625 Southern Services, Inc.

Bimingham, Alabama 35202 Mr. Harry Majors Southern Services, Inc.

300 Office Park Birmingham, Alabama 35202 Mr. William Widner Georgia Power Company Power Generation Department P. O. Box 4545 Atlanta, Georgia 30302 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. O. Box 4545 Atlanta, Georgia 30302 Appling County Public Library Parker Street Baxley, Georgia 31413 Mr. R. F. Rogers U. S. Nuclear Regulatory Commission P. O. Box 710 Baxley, Georgia 31513 13'd1M5'

,