ML19208A546

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-280/79-48 & 50-281/79-68 on 790803.No Noncompliance Noted.Details Withheld (Ref 10CFR2.790)
ML19208A546
Person / Time
Site: Surry  
Issue date: 08/29/1979
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19208A547 List:
References
NUDOCS 7909140527
Download: ML19208A546 (2)


See also: IR 05000280/1979048

Text

f3rRIAL TPGSMITT:3 HEREWITH

f

CONTAINS 2.7!DiiiiG !!!ATl0N

/ /C

  1. pa a'%q'o,

-

UNITED STATES

! h .,., ( *g

NUCLEAR REGULATORY COMMISSION

g , gg

,

g

REGION 11

h[!

N

8

101 MARIETTA ST., N.W., SUITE 3100

o

'

E

ATLANTA, GEORGI A Jo3o3

o

.....

In Reply Refer To:

AUG 2 91979

.

RII:WJT

50-280/79-48

50-281/79-68

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. O. Box 26666

Richmond, VA 23261

Gentlerr.en:

This refers to the inspection conducted by W. J. Tobin of this office on August 3,

1979, of activities authorized by NRC License Nos. DPR-32 and DPR-37 at Surry

Nuclear Station, Units 1 and 2 and to the discussions of our findings held with

J. Wilton at the conclusion of the inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Federal Regulations, Part

73, " Physical Protection of Plants and Materials" and the specific requirements

of your approved Security Plan. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, performance tests, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosed

inspection report with the exception of the report cover page, which is an

inspection summary, will not be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

S' ce ely,

-

?

hNw

AW

I

y lam B. Kenna,

ief

"Jafeguards Branch

(y()Q@

Enclosure:

Inspection Report Nos. 50-280/79-48

and 50-281/79-68

790914C 9 7

cc:

See Page 2

PATER!?.L TRAE!MTT:D HFRBVITH

CCHTA!NS 2.7E3 INFC2.'dT153

MATERIAL TPES!.3"J !!E""F'TH

,

CCN!AtiS 2.72')INFOR*'.ATi3N

Virginia Electric and

b.,G 2 91979

Power Company

-2-

-

cc w/ encl:

,

W. L. Stewart, Manager

'

'

P. O. Box 315

'

Surry, VA 23883

'

,

\\

,

%

'

\\

,

'

,

h

4

X

,

\\

BGOODO

ht\\TERL'.t TRA!!S!'!TTD i!EREWITH

C0HTAINS 2.750 iSFSRI.'ATION