ML19208A344

From kanterella
Jump to navigation Jump to search
Requests Util Analyze Potential Ponding at Proposed Interim Solid Radwaste Storage Area in Desilting Basin.Periodic Checks Shall Be Carried Out & Provisions Made for Backup Pumps to Minimize Ponding
ML19208A344
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/16/1979
From: Jay Collins
Office of Nuclear Reactor Regulation
To: Rusche B
METROPOLITAN EDISON CO.
References
NUDOCS 7909130434
Download: ML19208A344 (1)


Text

.f***% i UNITED STATES

['.f 4..

NUCLEAR REGULA TORY COMMISS!ON h

E W ASHINGTCN D. C 20ss5

< g.. m;p..

. ?wh / i

%o O*#

Mcv 16, IFc

".EMO PANDUM FOR:

B. Rusche

3C"-

J.

Collins Sd5 JECT:

HYDRCLOGIC :P,lTEklA FD: FROPOSED INTER!M SOLID WAS TE S TO:A C E A RU.

The proposed location for interi.m storage o' solid waste generated

' rom the operation of EF CCRE 11 is the Uni 2 desi! ting basin, located in the SE area of the station.

Met-Ed must provide assurance that the maximum expected precioitation curing the l i f e t i.me (about l+ months) of the facility will not result in "ponding" which will jeopardize the intbgritv of the facility.

To that end, Met-Ed snali provide an enalysis of potential "ponding" in the desilting basin due to the maxinum expected precipitation and assuming 3 olockage of the drainage system.

Met-Ed shall also consider a c,i n i s t ra

  • i ve controls such as periodic checks o# the drainage s e em anc provisions for backup pumping to mininize the potential
  1. ce "ponding' during the expected k montn li#e o# the storage facility.
j. T.

Co n ins cc:

R.

Vellrer R. Weller K. Pastor R.

Jil1ians J.

Logan h

D u, u!

3 u

7-3 I

I a

0 LfC.j$hljVOdLa 7 909-13 Of'$f