ML19207C263

From kanterella
Jump to navigation Jump to search
Requests Time Extension for Inventory Reconciliation Re Application for Amend S-8 to License SNM-1097 to Revise Fundamental Nuclear Matl Control Plan.Forwards Addl Info Requested by Nrc.Info Withheld (Ref 10CFR2.790)
ML19207C263
Person / Time
Site: 07001113
Issue date: 07/24/1979
From: Kaplan A
GENERAL ELECTRIC CO.
To: Partlow J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
13771, NUDOCS 7909100570
Download: ML19207C263 (3)


Text

y

.m w.

GENER AL h ELECTRIC nuCtennenenGv PRODUCTS DIVISION wiLMINGTON MANUF ACTUAING CASTLE HAYNE ROAD. P. O. BOX 780. WlUAINGTON, N. C. 28401. 4919) 343 5000 July 24,1979 Director

' gm t ; (.of Office of Nuclear 5!aterial Safety & Safeguards

,s f 4

U. S. Nuclear Regulatory Ca mission

, ~[ "']

, s. -

Washington, D. C.

20555 f

g Attention: 51r. James G. Partlow, Q11ef 5!aterial Control Licensing Branch

' 2 >.h

,~ i

Dear Sir:

/., /

qs

References:

(1) NEC License SM!-1097, Ibcket =70-1113 (2) Intter, A. L. Kaplan to J. G. Partlow, 4/2/79 (3) Latter, A. L. Kaplan to J. G. Partlow, 4/4/79 (4) letter, A. L. Kaplan to J. G. Partlow, 5/4/79

Subject:

50DIFICATION 3* 'IO APPLICATION A',DTt.DT S-8 PHYSICAL INVENICIE OF LO PFTEIS & CERTAIN CONTAINERS OF SMI 2

With refemnce to activities authorized by S21-1097 at the Ceneral Electric fuel fabrication plant in Wilmington, N. C., Ceneral Electric recently subaitted a request for authorization to revise the Fundn.msntal Nuclear 5!aterial Control (FM'C) Plan for this plant, related to the handling of 102 pallets and of certain containers of special nuclear material (SMI) at the time of a physical inventory.

(See references 2-4.)

As a result of reviewing our previous subnittals, your staff mquested further infonnatica mlated to the SM! to which the mquested authorization would apoly.

This infonnation is contained in the attachmnt to this letter.

This subnittal contains a request to extend the time period for inventory reconciliation frtri 30 days to 45 days from the start of the inventory. As outlined in the attachnent, the reascn for this mquest is mlated to the time required to verify by remeasurenent the prior measurcrrnts of inprocess itcms which_ are untunpersafed at the time of the inventory.

Your interpretation of 10 CFR 70.51(f)(3)(ii) which stipulates this mquirecent causes General Electric to remasure each and ever/- such untampersafed item in order to verify the prior measurement on the iten (i.e.,100c*c reneasurenent of such itans). The extra time requested is required in olf.er for GE to accormlish this mneasumnent with a satisfactory degne of accuracy.

Ap;:l::3nt...,.....,,,,,,,,,,,,'

Che:;; ifo. f ' Y w, o-Em;:n' Fee CatNkorf.k'.bf-ih

  • y o n"

Type cl 7:e qm,pg Da'e CI:e::<,12:'d. Jh.N.S R 3 C C.'3:13.,:2.%n.

/

Y, _'.

1 13771 1909100 S70 C

a*

s.

J G E N E R A L (3 ELECTRIC Director July 24, 1979 Page 2 Pursuant to 10 CFR 2.790(d), General Electric requests that the attach:mnt to this letter be withheld firm public disclosure since it contains inforr:ation which identifies General Electric's procedures for safeguarding licensed special nuclear material.

General Electric personnel would be pleased to discuss this matter with you and your staff as you may deen necessacy.

Very truly yours, GEERAL ELECIRIC CGIPXiY bIIM whur L. Kap 1

, Manager Licensing & Cccpliance Audits M/C J26 AIX:tmv cc:

W. B. Kenna, NRC-Atlanta Attachment SGD-L 83CU.~58 m.

~-

~ L of :

1: :.a. 7/- ///3 8ff/7f
=i:

i i

l l'0TICE TO I!RC PUBLIC Dr. T.T ?.^,0.'!

[

i l

3 l

The ~ folTowing item (s) are being uir-Mei frca puM ic di; laz, e j

pursuant to the Atomic Energy Act of 19., n amendal, i:n _' tha r

Energy Reorganizatica Act of 19~/4.

l Enclosures % /4 dM.

og 2/ 7) tajiM4e/d'.

l h

a D

@D q

bd

~

org g,7

'h E. ' N L h.

i

(

k i

I 33C3Z9 9

!,