MONTHYEARML19289C9691979-01-18018 January 1979 Forwards Request for Addl Info Re Onsite Emergency Power Sys to Complete Review of Protection from Degraded Grid Voltage Conditions.Requires Response within 30 Days Project stage: RAI ML19263C8871979-03-0707 March 1979 Forwards Replies to Request for Addl Info Re Voltages on Safety Related Station Svc Electrical Buses.New Undervoltage Protection Will Be Installed & in Svc by Dec 1980.W/encl Appropriate Affidavit Project stage: Request ML19242A3091979-07-0202 July 1979 Responds to Util 790307 Request for Technical Assistance Re Degraded Grid Voltage.Addl Info Required by NRC to Complete Review.Request for Addl Info Encl Project stage: RAI ML19247B8501979-07-0505 July 1979 Requests Addl Info for Review of Degraded Grid Voltages on safety-related Station Electrical Buses Project stage: Approval ML19207C1671979-09-0404 September 1979 Notifies That Responses to on Degraded Grid Voltages & Re Adequacy of Station Electric Distribution Sys Voltages Are Currently Under Study & Will Be Forwarded by 791008 Project stage: Other ML19209C8401979-10-15015 October 1979 Forwards Info Re Station Svc Bus Voltages,In Response to 790705 & 0808 Requests Project stage: Other ML19291C2191980-01-17017 January 1980 Advises of Delay in Completion of Voltage Study Re Station Svc Bus Voltage Conditions.Results of Study & Proposed Tech Specs Associated W/New Undervoltage Relays on Class IE 4160-volt & 480-volt Buses to Be Completed by 800215 Project stage: Other ML19323C5621980-05-14014 May 1980 Application for Amend 46 to Ol,Providing Proposed Tech Spec Changes.Revisions Include Addition of safety-related Hydraulic Snubbers to Table 3.7-4 & Mod of Surveillance Requirements for Auxiliary Feedwater Sys.Affidavit Encl Project stage: Request ML19323C5641980-05-14014 May 1980 Proposed Tech Spec Changes.Provides for Addition of safety-related Hydraulic Snubbers to Table 3.7-4 & Mod of Surveillance Requirements for Auxiliary Feedwater Sys Project stage: Other ML19330A8481980-07-24024 July 1980 Documents Verbal Responses to NRC Questions Re Station Svc Bus Undervoltage Relays Project stage: Other ML20002A5461980-10-31031 October 1980 Degraded Grid Protection for Class IE Power Sys,Beaver Valley Power Station, Technical Evaluation Rept Project stage: Other ML20039B6541981-12-15015 December 1981 Advises of Revised Design Concept Which Calls for Installation of New Station Svc Transformers Equipped W/Automatic Tap Changing Secondary Capability.Installation Scheduled for Refueling Outage Beginning 820101 Project stage: Other 1979-09-04
[Table View] |
Text
'Af (412) 456-6000 ns s.m 4 ~
Ow'7 Pa September 4, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:
A. Schwencer, Chief Operating Reactor Branch No. 1 Division of Operating Reactors Washington, DC 20555
Reference:
Beaver Valley Power Station Docket No. 50-334 July 5th and August 8th Requests for Electrical Bus Voltage Information Gentlemen:
The purpose of this letter is to inform you of the status of our responses to Mr. Schwencer's letter of July 5, 1979, concerning " Degraded Grid Voltages" and Mr. Ca==111's letter of August 8, 1979, concerning the " Adequacy of Station Electric Distribution System Voltages."
Our Electrical Engineering Department is engaged in comprehensive studies to respond fully and completely to the detailed engineering questions submitted in these transmittals.
Since these two subjects are so closely interrelated, we can not respond completely to the July 5 letter until the studies requested in the August 8 letter are completed.
We will reply to both of these letters within the 60 day period from the date of your August 8 letter.
Very truly yours, C. N. Dunn Vice President, Operations cc:
D. A. Beckman Region I King of Prussia, Pa.