ML19207C011

From kanterella
Jump to navigation Jump to search
Forwards LER 79-053/03L-0
Date released: 08/09/2019 Download: ML19207C011


LER 79-053/03L-0:on 790804,reactor Core Isolation Cooling Steam Isolation Valve F007 Would Not Open While Performing Penetrant Tests 10.1.1 & 10.2.Caused by Oxidation of Surfaces of Breaker Pickup Coil.Surfaces Cleaned
ML19207C015
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/28/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207C015 (2)
Forwards LER 79-053/03L-0
ML19207C010
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/28/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207C010 (1)