ML19207B934

From kanterella
Jump to navigation Jump to search
Forwards LER 79-067/03L-0
Date released: 08/09/2019 Download: ML19207B934


LER 79-067/03L-0:on 790803, Full Out Indication Not Received When Rod 42-23 Pulled to Position 48.Cause Is in Prototypic Inlet Piping Probe Located in Drywell.Problem Will Be Corrected During Next Outage of Sufficient Length
ML19207B936
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/30/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B936 (3)
Forwards LER 79-067/03L-0
ML19207B933
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/30/1979
From: Furr B
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B933 (1)