ML19207B564
| ML19207B564 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 08/15/1979 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| References | |
| NUDOCS 7908300275 | |
| Download: ML19207B564 (1) | |
Text
p ** * * %<,fo, l (-
s UNITED STATES
=
4} s,(f( 7, NUCLEAR REGULATORY COMMISSION
$t-
~#.. i REGION 111 0,
[
799 ROOSEVELT ROAD f
%.N v o'
GLEN ELLYN, tLLINolS 60137
..+
AUGL5is/9 Y
Docket No. 50-409 4_
Jairyland Power Cooperative gTTN:
Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
The enclosed supplement to IE Bulletin No. 79-14 is forwarded to you to provide added guidance on the intent of the Bulletin.
If you desire additional information regarding this matter, please contact this office.
Sincerely, b
%/
ames G. Keppler #
Director
Enclosure:
Supplement IE Bulletin No. 79-14 cc w/ enc 1:
Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Anthony Roisman, Esq.,
Attorney r_
t 852 270 7 9083 0027f
SSINS:
6820 Accession No:
790808036tr 4
i 1
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 August 15, 1979 6
?
(
Supplement IE Bulletin No. 79-14 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS Discription of Circumstances:
IE Bulletin No. 79-14 was issued on July 2,1979 and revised on July 18, 1979.
The bulletin requested licensees to take certain actions to verify that seismic analyses are applicable to as-built plants. This supplement to the bulletin provides additional guidance and definition of Action It::ms 2, 3, and 4.
To comply with the requests in IE Bulletin 79-14, it will be necessary for licensees to do the following:
2.
Inspect Part of the Accessible Piping For each system selected by the licensee in accordance with Item 2 of the Bulletin, the licensee is expected to verify by physical inspection, to the extent practicable, that the inspection elements meet the acceptance criteria.
In performing these inspectons, the licensee is expected to use measuring techniques of sufficient accuracy to demonstrate that acceptance criteria are met.
Where inspection elements important to the seismic analysis cannot be viewed because of thermal insulation or location of the piping, the licensee is expected to remove thermal insulation or provide access. Where physical inspection is not practicable, e.g., for valve weights and materials of constructions the license is expected to verify conformance by inspection of quality assurance records.
If a nonconformance is found, the licensee is expected in accordance with Item 4 of the Bulletin to perform an evaluation of the significance of the nonconformance as rapidly as possible to determine whether or not the operability of the system might be jeopardized during a safe shutdown earthquake as defined in the Regulations. This evaluation is expected to be done in two phases involving an initial engineering judgement (within 2 days), followed by an analytical engineering evaluation (within 30 days). Where either phase of the evaluation shcus that system operability is in jeopardy, the licensee is expected to meet the applicable technical specification action statement and complete the inspections 4
N required by Item 2 and 3 of the Bulletin as soon as possible. The licensee f.j-ments for content and schedule 7JPLICATE DOTMENT must report the results of thesi