ML19207B296

From kanterella
Jump to navigation Jump to search
Forwards LER 79-043/01T-1
Date released: 08/09/2019 Download: ML19207B296


LER 79-043/01T-1 on 790628:radwaste Sump Discharge Piping Between Drywell Penetrations & Second Containment Isolation Valves Was Not Supported Per Seismic Class I Requirements. Caused by Design Error.Supports Redesigned & Installed
ML19207B300
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/17/1979
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B300 (3)
Forwards LER 79-043/01T-1
ML19207B295
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/17/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B295 (1)