ML19207B281

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/79-19 on 790528-0601.No Noncompliance Noted
ML19207B281
Person / Time
Site: Point Beach, Crystal River  
Issue date: 07/05/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19207B282 List:
References
NUDOCS 7908240291
Download: ML19207B281 (2)


See also: IR 05000302/1979019

Text

Ti

'

/

'o

UNITED STATES

,"

8 ' , .,. 7/[,j

NUCLEAR REGULATORY COMMISSION

g

'"/j ,

c

REGION 11

o

8

101 MARIETT4. OT., N W.. SUITE 3100

.....f

<

ATLANTA, GEORGIA 30303

In Reply Refer To:

JUL

5 1979

RII:PTB

50-302/79-19

Florida ~ Power Corporation

ATTN:

W. P. Stewart, Manager

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petr.rsburg. FL 33733

Gent.lemen:

This refers to the inspection conducted by P. T. Burnett of this office on

May 28 to June 1, 1979, of activities authorized by NRC Operating License

No. DPR-72 for the Crystal River Unit 3 facility, and to the discussion of our

findings held with P. F. McKee at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified it

separate part of the document.

the application is contained in a

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss tLem with you.

Sincerely,

Le L F

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

781043

Support Branch

7 C7 /

7908M0-tt

.

Florida Power Corporation

-2-

JUL

5 1979

'

7.nclosure:

Inspection Report No. 50-302/79-19

c w/ enc 1:

G. P. Beatty, Jr.

' Plant Superintendent

P. O. Fox 1228

Crystal River, FL 32629

781044

,