ML19207B108

From kanterella
Jump to navigation Jump to search
Forwards LER 79-058/03L-0
Date released: 08/09/2019 Download: ML19207B108


LER 79-058/03L-0 on 790719:during Reactor High Pressure Trip Calibr & Functional Test,Switch 1 of Instrument 2B21-PS-N023C Did Not Actuate Per Tech Specs.Caused by Instrument Drift.Instrument Recalibr
ML19207B109
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/15/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B109 (1)
Forwards LER 79-058/03L-0
ML19207B107
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/15/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19207B107 (1)