Forwards IE Insp Repts 50-245/79-12 & 50-336/79-15 on 790507-11.No Noncompliance Noted
ML19207A472
Person / Time
Site: Millstone  
Issue date: 06/25/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19207A473 List:
References
NUDOCS 7908200062
Download: ML19207A472 (2)


See also: IR 05000245/1979012

Text

[M

.- _,

g%o

UNITED STATES

[p

Do

NUCLEAR REGULATORY COMMIS510N

!"

s., ( - [ g

REGION I

$

. g

631 PARK AVENU2

KING O F PRUS$t A, PENN5YLV ANI A 19406

'

yw,

  • ...*

yan 2 E 1979

Docket Nos. 50-245

50-336

'

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operstions

P. O. Box 270

Hartford, Connecticut

06101

Gentlemen:

Subject:

Combined Inspection 50-245/79-12 and ?O-336/79-15

This refers to the inspection conducted by Mr. W. F. Sander of this office on

May 7-11, 1979 at the Millstone Nuclear Station, Waterford, Connecticut of

activities authorized by NRC License Nos. DPR-21 and DPR-65 and to the discussions

of our findings held by Mr. Sanders with Mr. J. Opeka of your staff at the

conclusion of the inspection.

Areas examined durit.g this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure. Any such application

must b*e accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

7 908200 0 6g

g

809

044

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-145/79-12 and 50-336/79-15

ce s/ encl:

J. V. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assuran.